Scope note — this is a public reference guide. Shanghai Bridges works with importers, distributors and brand owners only. Minimum order value for a sourcing mandate: US$15,000 for building materials, US$30,000 for stamping and metal parts.
Our fixed-fee on-site visits cover commercial goods and used industrial equipment intended for resale or production. We do not take single-unit consumer inspection jobs — used phones, laptops, cameras or personal purchases — and we do not grade or authenticate second-hand consumer electronics.

Home › Sourcing Guides › Which inspection do I need
The six checks, on one page
Read the fourth column first. Every one of these checks is bought for what it proves, and almost every wasted inspection dollar is spent on a check that was never able to prove the thing the buyer was worried about.
| Check | What it looks at | What it proves | What it cannot prove | 2026 fee band |
|---|---|---|---|---|
| Identity and desk check | Business licence, registered address, export record, bank account name | That a real legal entity exists and is the one you are paying | That it can make your product | Free, or bundled into a visit |
| Fixed-fee site visit | The specific item or small lot, filmed, written up | That these goods exist and match the listing today | Anything statistical about a production lot | From US$60 |
| Factory audit | Equipment, QMS, calibration, capacity, references | Whether the plant can make your product at your volume | Whether this batch is good | US$400–900 per man-day |
| During-production (DUPRO) | Work in progress at roughly 20–50% completion | Process drift, while correcting it is still cheap | Defects that appear later in the run | US$200–400 |
| Pre-shipment (PSI) | Finished, packed cartons, AQL sampling | Whether this lot meets the AQL you agreed | Whether the supplier will repeat it next time | US$190–400 |
| Loading supervision | Carton count, container condition, seal number | That what you passed is what actually sails | Anything about the quality already inside | US$150–380 |
Which check for which risk
Find your situation in the left column. The correct answer is almost always the cheapest row that touches the money you are about to move — not the most thorough one.
| Situation | The risk you are carrying | Check that settles it | Do this first |
|---|---|---|---|
| A. Seller unknown, nothing paid yet | Sending money to a stranger | Identity check, then a fixed-fee site visit | Match the bank account name against the licence — before anything else, free |
| B. Deposit paid, production claimed | Paying for goods that are not being made | During-production | Ask for a dated photo of the lot with your PO number in frame; a real workshop can produce it the same day |
| C. Goods finished, balance due | Releasing money against a promise | Pre-shipment | Fix the AQL level in the purchase order, not in an email afterwards |
| D. First order, new supplier | Capability, not just quality | Factory audit, then pre-shipment | Audit before you place the order, never after |
| E. Used industrial equipment for resale | Condition and existence | Fixed-fee site visit | Get serial-number photos from the seller before booking, and compare them to what the visit films |
| F. Repeat order, proven supplier | Cargo handling, not quality | Loading supervision, optionally paired with PSI | Book both on the same day — two visits to one factory is a wasted man-day |
The most expensive mistake in this table: buying proof of one kind and treating it as proof of another. A seller's photo set and a ninety-minute site visit are both "checks", and neither of them survives an AQL dispute. If the document has to stand in front of a bank, a marketplace claim or your own buyer, only a recognised inspection report does that. A US$60 visit is not a cheaper version of a US$300 inspection — it is a different instrument that answers a different question.
Fixed-fee visit or inspection firm
Both are legitimate. They are separated by what the report is allowed to do, not by how serious the person doing it is.
| Aspect | Fixed-fee local visit | Third-party inspection firm |
|---|---|---|
| Scope | Named items or one small lot, in one place | A defined lot against a written specification |
| Sampling | Everything you named, nothing sampled statistically | AQL plan drawn from the lot size and inspection level |
| Output | Video plus a written account of what matched and what did not | Branded report with defect classification |
| Liability | An individual's written account; no certification behind it | A company with a complaints and re-check process |
| Turnaround | Often same day, because there is no queue | Booked days ahead; reports on a fixed cycle |
| Right for | Before a deposit, on used industrial equipment, on a commercial marketplace order, on a small first payment | Before releasing a balance on a production lot, or when a third party demands the report |
| Wrong for | Any dispute that needs a recognised standard | A single consumer unit that costs less than the inspection |
What no check can establish
Honesty about the ceiling is part of the product, so here is the list of things even a good inspection will not tell you:
- Capability beyond what you were shown. A clean floor and a good sample room are evidence of a good sample, not of a good run.
- Whether they will repeat it. Inspection measures a lot. Consistency across lots is a management question and it lives in the audit, not the PSI.
- A defect that appears in service. Thermal cycling, fatigue and wear are not visible in a packed carton on the day.
- Who really owns the plant. Subcontracting exists; you can only confirm the site you were taken to, and the paperwork behind it.
- Anything about a supplier you refused to name. Vague briefs get vague reports, and a green report on the wrong product is worse than none.
The order the work happens in
This sequence is also the thing to quote against — every step carries a cost and a decision, and skipping one does not remove its cost, it moves it later to a worse place.
- Write the requirement down in measurable terms. Tolerance, function, packing, marking. Without this an inspector has nothing to measure and will pass everything.
- Verify the counterparty. Licence, registered address, and the name on the bank account. This is free and it prevents the most common loss.
- Agree who pays for which check before the deposit. Cheap to discuss at the quotation stage, impossible afterwards.
- Book at the point where a fix is still cheap. Sample, or 20–50% of production. At 100% packed the only options left are rework, sorting or rejection.
- Put the reject path in writing. Rework and re-inspect, sort at the supplier's cost, or reject. A failed report without a clause is a document, not leverage.
- Release the balance last. Not a matter of trust: staged payment is the only lever that still works once goods are packed.
The fee side of this is worked through in what inspections cost in China, the supplier side in the factory audit checklist, and the goods side in the used-goods inspection checklist.
Four buyers, four different answers
The same question gets four different answers depending on how much money is already committed and what happens if the answer is bad.
First import, US$2,000–10,000
What settles it: identity check plus a pre-shipment inspection on the finished lot. Decision it unlocks: whether this supplier gets a second order at all — which matters more than this shipment.
Trading company consolidating several factories
What settles it: one visit covering the two or three suppliers that matter, scoped to specific items in advance. Decision it unlocks: which supplier to drop from the next consolidation, before your own buyer tells you.
Used machinery or electronics
What settles it: a site visit with serials on camera and a run test if the machine can be powered. Decision it unlocks: pay, negotiate down, or walk — usually inside the same day the listing is still live.
Repeat buyer whose supplier slipped once
What settles it: during-production rather than pre-shipment. Decision it unlocks: whether to intervene while the rest of the run can still be corrected, instead of rejecting a finished batch.
When the right answer is nothing
If the order is worth less than the check, do not buy a check — reduce the exposure instead. A smaller first order, payment staged against documents, or a platform with dispute cover will do more for you than a report costing a fifth of the goods. Inspection is a tool for reducing uncertainty you cannot otherwise remove; where the uncertainty is cheap, spending on it is just a slower way to lose.
Common questions
Do I need a factory audit before a pre-shipment inspection?
Only on a first order from a supplier nobody has vouched for. An audit answers whether the plant can make your product at your volume; a pre-shipment inspection answers whether this particular lot is good. On a first order both questions are open, so audit first and inspect later. From the second order the capability question is largely settled and the pre-shipment check carries the risk alone.
Is a cheap local site visit enough instead of a pre-shipment inspection?
It depends what the report has to survive. A short fixed-fee visit answers whether the goods exist, match the description and are in the stated condition - enough to decide about sending a first payment to an unknown seller. It does not sample a production lot to an AQL level, so it will not hold up in a platform claim, a chargeback or a dispute with your own buyer. Use it to avoid being defrauded, not to certify a batch.
How many checks does a first order from China need?
Three at the low end, and none of them is optional: verify the legal entity and that the bank account name matches the business licence, settle capability with a factory audit or a reference call, and inspect before releasing the balance. Buyers who skip the first one lose money to fraud; buyers who skip the third lose money to defects. The second one can sometimes be replaced by a documented reference from a buyer who actually received goods.
Can one visit cover several suppliers in the same city?
Yes, within travel limits - a day has to include moving between sites. Two or three suppliers in one industrial district can usually be seen in one day if each check is scoped in advance to the specific items, and it is worth telling the person doing the visits which supplier matters most, because the time rarely divides evenly. Suppliers spread across two cities are two visits, priced as two.
What happens if the inspection fails?
The report is only useful if the consequence was agreed before the visit. Put three outcomes in the purchase order: rework and re-inspect, sort out the defective units at the supplier's cost, or reject the lot. Without that clause a failed inspection leaves you holding a document, a deadline and no leverage, and a re-inspection is billed as a second full visit rather than a discount repeat - which is why booking earlier in production, where a fix is still cheap, is usually the better spend.
Tell us the situation, not the service
Send five things: the commercial goods, the supplier's name and address, what has to be confirmed, how much money is at risk, and the deadline. If a short visit in Shanghai settles it, that is from US$60. If your case needs an AQL day, we will say so and point you at a firm that does it — that answer costs nothing.
Book a fixed-fee visit